Early Spring Work On The Garden Railroad

Hello, hivers!

It's been a bit of a struggle for me to come up with something to write about lately. It's not so much that I had nothing to write about, it's been more a matter of end of winter blahs and lack of ambition to focus on writing here on hive. The late winter blues tend to do that to me.

The past several days have been rather nice with the day time temperature rising to about 50 degrees F. It's starting to feel like spring outside, and that has had a definite positive effect on my mood. I've spent the past few afternoons outside doing a few things. There's not much I can really do outside yet because there's still snow on the ground, and the melting has everything wet and muddy. One good thing is that the snow has melted off my railroad enough that I could use it again if I wanted to.

Today, I decided to do a bit of work on the railroad, to get a headstart on the spring work. I wanted to start working on the turnout that I didn't do much with last year. I had built the start of the turnout last year as part of building the railroad. This year I'm planning on building the track to the area where I keep the firewood for the fire ring that's in the yard. This is the part of the turnout that I had put in place last year. The straight rail ends at the snow pile. I need to start by adding the other straight rail to continue building the turnout.

DSCN6233.JPG

Shitaki is the track inspector.

DSCN6234.JPG

I had to measure the approximate length for the piece of rail that I need to put in place, and then cut the rail to fit.

DSCN6230.JPG

DSCN6231.JPG

Then I had to test fit the piece of rail, and grind off what was needed to make it fit properly.

DSCN6235.JPG

It took a bit of grinding to get the proper shape for the new piece of rail to fit against the other piece of rail.
DSCN6238.JPG

I managed to get the piece of rail to fit nicely, and then I screwed it in place on the ties.

DSCN6240.JPG

The next step in this process will be to add the piece of straight rail on the inside of the curve section, and cut the notch in the curved rail for the wheel flange to pass through. I'm not too sure when I'll be able to do that, it depends on how the weather is over the next several days. I'm not in a hurry to get it done, it just seemed like a good thing to start on a nice day when there's not much else I can do outside yet.

That's all I have for this post, thanks for checking it out!

amber_yooper.png



0
0
0.000
11 comments
avatar

Do you have a mechanical switch system or rely on some other process at these points?

0
0
0.000
avatar

Right now, I don't have the points set up yet. I hope to have a mechanism to move the points once I finish getting them built.

0
0
0.000
avatar

Can you train the cat to work the SwitchPoint? That way, you never have to leave the cart!!!

0
0
0.000
avatar

although, I ahve two cats, and I think all Cat Owners know how it works when you try and TRAIN CATS!!!

0
0
0.000
avatar

Yay! A new railroad post! I find the snow a big distraction looking at the railroad. Hopefully the next post will show green...

0
0
0.000
avatar

Yeah, that would be nice...
It takes a while for that much snow to melt.

0
0
0.000
avatar

You have a railroad in your garden?! What does it do? Interesting, if you have the time and space...

0
0
0.000
avatar

The railroad doesn't really do very much. I use it to haul stuff that I probably could haul with a wheelbarrow, and I occasionally ride on the flatcar. I only have the one car right now, I either push it or pull it by hand to move stuff. It runs from the back gate bu the alley, through the garden, and up to the front of my greenhouse. It's probably about 100 feet from end to end. I built it for fun, as much as for anything else.

0
0
0.000
avatar

Cool though. If anything it is like a semi-working garden ornament.

0
0
0.000