What Did You Do Today | Renovation Repairs | Connecting the LED Light Cable

avatar



cldqdwaru00fn9kszbjcx6ta3_20230204_174308.webp
cldqdwhbv00gh8cszetua9c1q_20230204_174318.webp
cldqdwj9t00h167szcl2k7qfu_20230204_174329.webp
cldqdwpwd00hx23sz9xa69v07_20230204_174335.webp
cldqdwvmy00f56xszetj772df_20230204_174404.webp
cldqdwzwy00jb8psz3elohg3l_20230204_174422.webp
cldqdx5bg00fq9kszedqf67bc_20230204_223127.webp
cldqdx97300italsz9ejjh0sj_20230204_224006.webp

Greetings everyone, my work today was the construction of electrical installations for the renovation of a house. First of all, I went to a store that sells materials and took notes on what materials are needed, and I bought the necessary materials

Since it was the weekend today, I had to not make too much noise, so I quickly finished my crimean business. After doing my Crimean works, I started fixing the cases where I will install the sockets, I fixed the cases with plaster and plaster mortar

Unfortunately, I couldn't pull the electrical pipes and cables today, if I tried to pull, the cases would play and I would have to freeze them again, so I preferred to leave the piping and cable pulling tomorrow. Because they broke the bathroom wall, I canceled the electrical connections and cut off the excess pipes

We had to make led lighting for a customer tomorrow, and for this purpose, I first cut and prepared the led lamps in the dimensions I bought. Later, I cut the cables short enough to add them, it will be better to keep the cables short, as the connection points will not be very visible anyway. I fixed the cables on the led with the soldering machine, as can be seen in the picture, it happened very nicely, tomorrow it's left to assemble


For the best experience view this post on Liketu



0
0
0.000
1 comments